East Falmouth Library Project
In January 2025, the Town of Falmouth received a Massachusetts Public Library Construction Program (MPLCP) grant to plan and design a new East Falmouth Library.
The East Falmouth Library Building Advisory Committee (EFLBAC) was convened by the Select Board in March 2025. EFLBAC successfully recommended an Owner’s Project Manager (CHA Consulting, Inc.) and architect (Oudens Ello Architecture) for the project, and together with these professional partners, completed the MPLCP Planning and Design Phase in December 2025.
Funding was solidified at the October 2026 Town Meeting and through the ballot question in the November 2026 election.

FREQUENTLY ASKED QUESTIONS:
Q: What is the timeline for the new library?
A: The East Falmouth Library Building Advisory Committee (EFLBAC) will begin working on plans and designs in 2027, with opportunities for community input along the way. Construction is anticipated to begin in 2028, and we hope to open the new library in 2029.
Q:Where will the new library be located?
A: The new library will be built in the same general location as the current building, just a little closer to the road. It will still offer views of beautiful Mill Pond!
Q: What will happen to the current library building?
A: The current building will be taken down before construction of the new library begins.
Q: Will the East Falmouth Library be closed during construction?
A: Temporary library services and arrangements will be determined by the Town as the construction schedule develops. We will share more information as those plans take shape.
Q: What will the new library look like?
A: Full design and continued community input would begin in 2027.
Q: How can I get involved?
A: Community feedback will be an important part of the planning process, and we would love to hear your thoughts! The East Falmouth Library Building Committee will be offering opportunities for residents to share their ideas and feedback. Please check our website for information about upcoming community listening sessions and other ways to get involved.
THE DESIGN
Improved Site & Expanded Parking
- Wetlands remediation and on-site stormwater management will help improve Mill Pond water quality.
- Welcoming entry terrace, front porch and children’s reading garden.
- Expanded parking, with potential shared parking at Smitty’s.

Welcoming Gathering Spaces
- Covered entry porch with bench seating creates a welcoming arrival.
- Bookstore-style browsing area with comfortable seating and views of Mill Pond.
- Shared screened reading porch offers a unique place to enjoy the outdoors.
A New Community Space
- Flexible, multi-purpose room accommodates up to 50 people and supports multigenerational programming.
- Available for Town of Falmouth meetings and events after library hours.
Universal Accessibility
- Fully accessible design removes significant barriers found in the existing library.
- Includes accessible restrooms, proper clearances, and level floors throughout.
A Sustainable Future
- Net-zero-ready, fossil-fuel-free building designed for long-term energy efficiency.
- Features a super-insulated envelope, triple-glazed windows, LED lighting, low-flow fixtures and rooftop solar.
- The project is seeking additional State funding through the Green Library incentive program.
WHY A NEW BUILDING?
East Falmouth needs a place to gather:
A branch that already outperforms the typical Massachusetts branch:
Even in its current facility, East Falmouth posts above-median numbers on the measures that matter most — benchmarked against all 89 branch outlets statewide:
- Circulation: 34,030 items — above the statewide branch median of 28,491, and higher than roughly 60% of all Massachusetts branches.
- Visits: 23,563 — above the statewide branch median of 21,688.
- Programs: 129 programs drawing 1,585 attendees — program attendance beats the statewide median, and the branch does it with no dedicated program room.

It was a house before it was a library
Built as a home in 1950, the building was purchased by the Town in 1971 and converted into a library. After more than 50 years of service, it remains a house adapted for library use—not a purpose-built public facility. Only about one-third of the building is usable
Only about one-third of the building is usable
The current building contains about 7,200 SF, but only about 2,500 SF is usable for library services. The new library provides approximately 6,800 SF of accessible, purpose-built space.


More Than 2X the Usable Space
Floor Area Comparison
Less than half of the existing library‘s square footage is useable as a public program area. And much of that program area does not meet accessibility code requirements.
Program Comparison
The new library is only 20% larger than the existing, but will more than double the amount of net usable square footage.
The building needs major repairs
A 2023 assessment identified structural deficiencies, water infiltration, deteriorated exterior materials, a failed cooling system, moldy odor, and other significant building-condition concerns.
Repairing it doesn’t solve the problem
More than $2.1 million in immediate repairs were identified in the 2023 assesment—without addressing the building’s fundamental limitations in usable space, accessibility, layout, or programming



The building is not fully accessible
Stairs, non-compliant ramps, inaccessible restrooms, and an unusable lower level prevent equal access throughout the building. The new library will be fully accessible.


Estimated Project Costs
|
Construction Cost |
$12,618,331 |
|
|
Professional Services |
$2,795,447 |
|
|
Related Project Costs |
$1,278,946 |
|
|
Total Project Cost |
$16,692,724 |
|
|
MBLC Construction Grant Award |
($7,194,749) |
43.1% |
|
MBLC Green Library Incentive |
($215,842) |
1.3% |
|
Library Supporting Groups |
($3,000,000) |
18.0% |
|
Town of Falmouth Obligation |
$6,282,133 |
37.6% |
Keep an eye on this space for updates on the project. If you have any questions about the project or thoughts you’d like to share, please email us at eastfalmouth@falmouthpubliclibrary.org.
Agendas and minutes from EFLBAC meetings can be found on the Town of Falmouth website.






You must be logged in to post a comment.